EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing for Category : workshop
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (679)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
-
Wing Wiring
-
Landing Lights and...
-
Cockpit Light
-
Wing Tips
-
Nav/Strobe light...
-
Wingtip and Landing...
-
Wingtip and lights
-
Landing light
-
Wiring
Instrument Panel
- (8)
Landing Gear
- (6)
-
Main Gear
-
On the gear
-
Gear leg install
-
Tailwheel
-
Wheel, Brake and Tires
-
Wheels and Brakes
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (52)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1991
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Nov 13, 2023
Parts Rack
- (2 hours)
Category: Workshop
Built parts rack to hold painted parts prior to assembly. Used 1/2" steel conduit.
20231113_105848.jpg
Apr 09, 2021
Parts Board
- (3 hours)
Category: Workshop
Constructed parts board from large crate top. Used 2 Harbor Freight furniture dollies for the base. Cheaper than buying 8 castors and wood for a frame. Screwed boards directly to dollies on bottom. Used screws from the crate!
Parts Board (1).jpg
Parts Board (3).jpg
Parts Board (2).jpg
Apr 08, 2021
Organizing
- (2.5 hours)
Category: Workshop
Organized hardware on plywood top from large crate. Plan to mount on casters. Stapled hardware bags to plywood.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.